Digging for Answers (Available in Geoenvironmental Engineering Special Issue only)
Research at the six facilities that make up the National Geotechnical Experimentation Sites (NGES) has included tests on minipiles, groups of driven piles, shafts drilled in rock, and...

Testing the Load (Available in Geoenvironmental Engineering Special Issue only)
The Pittsburgh District of the U.S. Army Corps of Engineers recently began construction of a new gated dam to replace a nearly 100-year-old concrete fixed-crest dam on the Monongahela...

Wireless Warnings
Formwork failures cause dozens of construction-related deaths per year, but most can be avoided by adequate monitoring. The problem is, most monitors must be hard-wired to a computer on...

Taking a New Approach (available in Structural Engineering Special Section only)
The first bridge rehabilitation project in Washington, DC to use the AASHTO Load and Resistant Factor Design (LRFD) specification reveals several lessons to be learned from using the newly...

Communicating in a Crisis
As professionals following the strictest ethical standards, civil engineers are entrusted with safety and well-being of the public, regardless of the scale or range of their designs. By...

Examining the Capitol Dome
The dome of the United States Capitol, designed and built from the 1850s to the 1860s, is a masterpiece of 19th-century engineering and construction. The majority of the dome is made of...

Transportation Planning and Air Quality IV
Persistent Problems and Promising Solutions
This proceedings, Transportation Planning and Air Quality IV, consists of papers presented at the conference held in Lake Lanier, Georgia,...

Design Live Loads for Parking Garages
The objective of this research project is to obtain a better understanding of parking garage live loads and to recommend an appropriate value for design. A load survey was conducted in...

Foundation Design for the Elevated Station
The Amundsen-Scott South Pole Station is located at an elevation of 2,850 m on the 3,200 m thick polar plateau, a field of ice and snow that is moving toward the ocean at a rate of 10...

Weighing Anchors
Modern anchorage systems offer design engineers and contractors unprecedented choice in load transfer mechanisms. Some anchors are highly specialized, while others are appropriate for...

Bridging Substance with Style
Engineers used an elegant form to come up with a functional solution when designing the new Damen Avenue Arch in Chicago. Two steel ribs, created using heat induction bending, closely...

Structural Surgery
Structural engineers had to transform four existing buildings and two new buildings into a new non-profit center for Jewish history. The buildings were of varying ages and had different...

Growing Pains
Most small firms want to increase their business, but there are hidden dangers that can dampen even the most encouraging outlook. Small engineering firm executives and business consultants...

High Strength Concrete
This proceedings, High Strength Concrete, consists of papers presented at the first Engineering Foundation Conference on High Strength Concrete,...

Water, Water, Everywhere (Available in Geoenvironmental special issue only)
The discovery of extensive contamination just prior to construction of an underground library storage facility prompted engineers from the Minneapolis-based firms CNA Consulting Engineers...

Big-Firm Marketing Ideas That Can Work For You
Access to a large advertising and marketing budget may make it easier to attract clients, but bringing in new business doesn't have to be expensive. Marketing professionals...

Power Struggle
The Florida Light and Power Company could have replaced its deteriorating, H-shaped wooden power poles in the Tomoka River with exact duplicates, but they chose to use hybrid steel-and-concrete...

Sizing Up Seismic Bearings
Today in the U.S., there are two general technologies available to protect new and existing bridges from the damaging effects of earthquakes. One type, seismic isolation bearings, provide...

Under Pressure
The Arrowhead East and West contracts for the Inland Feeder water conveyance system being built in California consist of 51,500 ft (15,700 m) of tunnels that cross the San Andreas Fault...

Recent Advances in the Characterization of Transportation Geo-Materials
This proceedings, Recent Advances in the Characterization of Transportation Geo-Materials, contains a compendium of papers demonstrating a...

 

 

 

 

Return to search